1. added geothermal capacity

    Closed
    #133305286 0 1 0 0
  2. added wikipedia

    Closed
    #133291311 0 1 0 0
  3. changed to construction as website says "The plant design is currently being finalised and construction is expected to start in 2023." added repd data

    Closed
    #133291288 0 1 0 0
  4. added solar capacity

    Closed
    #133289908 0 1 0 0
  5. added panels and counted them

    Closed
    #133223654 130 1 0 2
  6. added module count; changed from plant to generator as 16 panels is not really a big plant

    Closed
    #133222833 0 1 0 0
  7. added solar panels, revised panel count

    Closed
    #133222397 108 5 0 0
  8. added repd:id, added fixme because of contradiction website 1 MW vs repd 3 MW

    Closed
    #133222068 0 1 0 0
  9. added power output

    Closed
    #133221920 0 1 0 0
  10. added power output and repd:id

    Closed
    #133221697 0 1 0 0
  11. created forest

    Closed
    #133191163 94 1 0 0
  12. add output from repd database

    Closed
    #133191054 0 1 0 0
  13. add output from repd database

    Closed
    #133190940 0 1 0 0
  14. created solar panels

    Closed
    #133190831 26 0 0 0
  15. added details for wind farm

    Closed
    #133190362 0 1 0 0
  16. Millour Hill wind farm: first part (not the extension) consists of 6 turbines each 3MW

    Closed
    #133190183 0 7 0 0
  17. created wind turbine and a track

    Closed
    #133189866 24 2 0 1
  18. reverting previous tag change. status=* is vague according to wiki, it is still industrial landuse, is is a disused power plant.

    Closed
    #132552705 0 1 0 0
  19. Details hinzugefuegt. Im Text steht dass das BHKW nun mit Bioerdgas betrieben wird. Ich bin mir nicht sicher, ob dies gewoehnliches Erdgas ist fuer das woanders Biogas ins Netz gespeist wird oder tatsaechlich Biogas ist.

    Closed
    #132425431 5 1 0 0
  20. power=plant hinzugefügt

    Closed
    #132418050 0 1 0 0