1998alexkane's Notes
Notes submitted or commented on by 1998alexkane
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 3935910 | 1998alexkane | Hier stehen Schielder für die B9 und B56: https://www.mapillary.com/app/?pKey=10042753162417396 Ist das nür veraltete Beschilderung, die Straßen.NRW nicht entfert hat? Solche kann man auf Kaiser-Karl-Ring finden. |
|||
| 3780837 | 1998alexkane | Suspicious access tags |
|||
| 3742802 | 1998alexkane | This instersection is being reconstructed and should be completed by fall 2023. Needs link roads, sidewalks, etc |
|||
| 5055746 | 1998alexkane | I believe the road name of Park Drive here is incorrect, based upon the Bing Streetside image, but the streetside image is very blurry, so it is hard to say |
|||
| 5044741 | 1998alexkane | The I-94 East-West Project has begun construction: https://www.94eastwest.wisconsindot.gov/ All of the freeways will be reconfigured from 70th Street to 16th Street |
|||
| 5043175 | 1998alexkane | The Bike Trails here seem to form a sort of route, is it signed as a bike route? |
|||
| 2150509 | JPMcL | Blocked off concrete steps and walkway on city-owned lot, leading down hillside and behind adjacent house to the east. Handrails have been removed, 2-3 lampposts no longer light the pathway. Steps and walkway meet up with similar closed-off steps and walkway that begin at corner of W Martin Dr and alley-driveway. The walkway ends at N 54th St |
|||
| 2150510 | JPMcL | Closed-off steps and stairway paralleling alley alongside apartment building, ending at N 54th St. |
|||
| 4393233 | adlerweb | Hier wurde offenbar neu gebaut (Umspannwerk?) |
|||
| 5032464 | 1998alexkane | I believe the "loop" bicycle route has been expanded or rerouted. See the route maker here at the intersection of East and Main (in 2025 Mapillary it is visible) |